I had a phone call to look at a hallway floor that was bouncing and causing a problem in the lounge. Once I had the floorboards up I could see that the joist was rotten and the brickwork had deteriated.
To resolve the problem I had to remove the deteriated brickwork and lay 2 new engineering bricks on a bed of mortar, put in place a new 7 x 2 joist and make good to the surrounding brickwork then refit the existing floorboards. Now there is no bounce and the customer can stop having to pick up fallen ornaments from the lounge floor.
No comments:
Post a Comment